Ques # :90 Consider these models of inventory Economic Ordering Quantity (EOQ) in all of which the inventory consumption is at a constant rate: (A) the replenishment is instantaneous but shortages are not permitted, (B) the replenishment is at a finite constant rate and no shortages are permitted, and (C) the replenishment is instantaneous but shortages are permitted. In which of these cases the total optimal inventory cost will be largest?
Asked in RPSC 02Jun 2016Question Paper for Asst. Engineer (Mechanical) GWD Screening Test - 2014ASST. ENGINEER - 2014
Answer under review: our editors are checking this question. Try the other RPSC Prelims previous year questions questions meanwhile.
More RPSC Prelims previous year questions questions
- Ques # :91 In which of the following replacement analysis methods, the interest rate enters into calculations?
- Ques # :92 Which of the following replacement methods take into account different types of depreciation and obsolescence?
- Ques # :93 Select the wrongly paired option
- Ques # :94 Dummy activities are employed to
- Ques # :95 The time by which the completion of an activity can be delayed beyond the earliest finish time without affecting the earliest start of a subsequent activity is called
- Ques #:96 In the context of CPM/PERT, the term crashing of network implies 1) Project has gone out of control 2) Diverting resources from non-critical activities to critical activities for timely completion 3) Short circuiting non-critical events 4) Abandoning the project
- Ques #:97 For transportation of loose granular material within factory involving both horizontal and vertical displacement, the most suitable material handling device will be 1) bucket conveyor 2) roller conveyor 3) screw conveyor 4) lift
- Ques #:98 Routing is most difficult in which type of production system? 1) Mass production 2) Batch production 3) Continuous production 4) Equally difficult in both the job and mass production