Unlike earlier plans that relied more heavily on simpler one-sector or two-sector models, the Fifth Plan incorporated a multi-sectoral framework using input-output analysis along with other models to address its complex objectives of poverty alleviation and self-reliance.
The main foundation of Fifth Five Year Plan was
Asked in WBCS Main Paper 5 2022 · Topic: Planning (Planning Models and Strategies (e.g., Nehru-Mahalanobis Model))
Show answer
Answer: C. Harrod-Domar one sector model, Leontief Input-Output Model and a Consumption sub- model.
More Economic Development questions
- The First Five Year Plan was based on the
- Which type of problems can be solved by using Simplex Method? - Question not attempted
- Simplex Method An algorithm designed for solving linear programming problems. 2. Linear Programming Problem (LPP) An optimization problem where the objective function and all constraints are linear. 3. Scope of Simplex Method Applicable to a wide range of problems that can be formulated as LPPs, including but not limited to assignment and transportation problems. 161. According to Harrod-Domar model, Warranted rate of Growth depends on which of the following on given incremental capital output ratio :
- Match List-I with List-II and select correct answer using code given below - List-I (i) Survey Method of Demand Forecasting (ii) Time Series Method of Demand Forecasting (iii) Smoothing Techniques of Demand Forecasting (iv) Delphi Method of Demand Forecasting List-II (a) Based on the average of past values of demand (b) Based on opinion of experts (c) Short-term Demand Forecasting (d) Based on past observation of data Code - (1) (i)-(a), (ii)-(b), (iii)-(c), (iv)-(d) (2) (i)-(d), (ii)-(c), (iii)-(b), (iv)-(a) (3) (i)- (c), (ii)-(d), (iii)-(b), (iv)-(a) (4) (i)-(b), (ii)-(a), (iii)-(c), (iv)-(d) (5) Question not attempted
- The Harrod-Domar model signifies which of the following?
- Economic saving of time results by crashing A) Cheapest critical activity B) Cheapest noncritical activity C) Costliest critical activity D) Costliest noncritical activity
- The estimated time required to perform an activity, is known as A) Event B) Dummy C) Duration D) Float
- The first Five-Year Plan in India (1951-56) was based on which of the following models?