The process of evaluating the rough cost of construction of a project is known as
Asked in GPSC Deputy Soil Survey Officer, Class-II 2024
Show answer
Answer: B. Estimate
More GPSC Prelims previous year questions questions
- Which of the following statements accurately describes aspects of pressure distribution under a strip footing? (i) The pressure bulb under a strip footing develops longitudinally. (ii) The pressure bulb under a strip footing develops laterally. (iii) The contact pressure at the edges of a rigid footing on saturated clay is theoretically infinite.
- In a detailed estimate, the provision for contingencies is, usually
- If the actual observed value of Standard Penetration resistance, N is greater 15 in a fine sand layer below water table, then the equivalent penetration resistance will be ?
- Match List-I (Field test) with List-II (Parameters measured) and select the correct answer List-I a. Plate load test b. Standard Penetration test c. Static Dutch Cone Penetration test d. Dynamic Penetration test List-II 1. Total and Frictional resistance 2. Load intensity and settlement values 3. Ncd values 4. SPT values
- Which is the weakest concrete?
- The value of demolished material is known as
- The primary function of geogrid is?
- Which one of the following characteristics is not measured by geophysical method of soil exploration?