The total cost of manufacturing a component consists of

Asked in Mizoram PSC JE P&E Deptt. Mechnical Engg. Paper-II-2015. 2025

  1. material cost, labour cost, direct other expenses and overhead expenses
  2. material cost, labour cost, factory cost, prime cost
  3. labour cost, direct material cost, overhead expenses
  4. none of these
Show answer

Answer: A. material cost, labour cost, direct other expenses and overhead expenses