The value of camber recommended for cement concrete roads in areas of heavy rainfall is
Asked in GPSC Provisional Key (Prelim) - 24/-23 Paper-2 2022
Answer under review: our editors are checking this question. Try the other GPSC Prelims previous year questions questions meanwhile.
More GPSC Prelims previous year questions questions
- The selection of site for road bridges depends on :
- In 70-R Loading, the minimum spacing between successive vehicle is
- As per I.R.C. recommendations, the approaches should have at least a minimum straight length of ______ on either side of a bridge
- In case of long tunnels, the drainage system consists of sump wells which are located at a regular interval of about
- Which one of the following tunneling methods is used for laying underground sewers?
- In River training work for bridge up to a height of about 12 m, the embankment is constructed ______
- The discharge per unit drawdown at a well is known as
- The Probable Maximum Flood is