What helps to understand the amount of time needed to complete different parts of the project?
Asked in TNPSC Evaluation and Applied Research (Subject Code 213)
Answer under review: our editors are checking this question. Try the other TNPSC Prelims previous year questions questions meanwhile.
More TNPSC Prelims previous year questions questions
- What is the tool to help strengthen project design, implementation and evaluation?
- An activity designed to identify, predict interpret and communicate information about the impact of an action on man’s health and well being is called as
- Which mapping tool can be used as an Evaluation tool for Women Empowerment project?
- Choose the correct option which sequences the phases of project life cycle correctly.
- Which of the following does not have an impact on the project cost, benefit and life?
- Which is a form of triangulation which cannot be used in a study according to Denzin? (A) Data triangulation (B) Perspective triangulation (C) Sampling triangulation (D) Investigator triangulation (E) Answer not known
- __________ is a preliminary study conducted on a limited scale before the original studies are carried out. (A) Observation (B) Pilot study (C) Interview (D) Pretest (E) Answer not known
- __________ interviews involve the use of a set of predetermined questions and of highly standardized techniques of recording. (A) Personal interview (B) Structured interviews (C) In-depth interview (D) Telephonic interview (E) Answer not known
All 17,707 TNPSC Prelims previous year questions questions →