Which of the following slows down fast neutrons in a nuclear power plant?
Asked in GPSC Provisional Key (Prelim) - 98/-21 PAPER 1 AND PAPER 2 2020
Answer under review: our editors are checking this question. Try the other GPSC Prelims previous year questions questions meanwhile.
More GPSC Prelims previous year questions questions
- A load curve is a plot of
- In a high head hydroelectric power station, a surge tank is provided to
- The function of economiser in a thermal power plant is to
- Which of the following will take least time in starting from cold conditions to full load?
- Spinning reserve is
- An SCR is
- After triggering an SCR, the gate pulse is removed. The current in the SCR will
- The triac is equivalent to