A cement concrete pavement of thickness 25 cm has two lanes of 7.2 m with a longitudinal joint along the centre. The value of allowable working stress in tension is 1800 kg/cm2. Assume unit weight of concrete = 2400 kg/m3 and coefficient of friction = 1.5. Estimate the area of steel per meter of longitudinal joint.
Asked in GPSC Gujarat Engineering Service (Civil), Class-1 and Class-2 2025
Answer under review: our editors are checking this question. Try the other GPSC Prelims previous year questions questions meanwhile.
More GPSC Prelims previous year questions questions
- A fixed time 2-phase signal is to be provided at an intersection having four arms. The design hour traffic and saturation flow are as under: North (N) South (S) East (E) West (W) Design hour flow 800 400 750 600 Saturation flow 2400 2000 3000 3000 The time lost per phase due to starting delays is 2 seconds. Estimate the optimum signal cycle length.
- The rise in water level due to the obstruction caused by bridge construction is called as
- A bridge has a linear waterway of 150 m constructed across a stream whose natural linear waterway is 250 meters. The average flood depth is 2.5 meters and the average flood discharge is 1500 m3 per second. Estimate the velocity of approach.
- A bridge that is constructed across a river has 3 spans. The clear distance between the two piers of the bridge is 20 meters. The width of each pier of the bridge is 5 meters. Estimate the length of the bridge.
- For a straight stream flow condition for bridge site, the value of design discharge is 650 m3 per second and the value of normal scour depth is 3.5 m. The value of constant for straight reach is 1.27. Estimate the maximum scour depth.
- The value of constant of variation is 50. The average cost of construction of one pier of the bridge is Rs. 45000. Estimate the economic span of the bridge.
- The value of maximum scour depth estimated using the Lacey’s formula is 9.0 m. The bridge site is at right-angled bend. The value of constant for maximum depth of scour at right-angled bend is 2.0. Assume Lacey’s silt factor for river bed as 1.0. Estimate the flood discharge under a bridge.
- A bridge is proposed to be constructed across an alluvial stream carrying a discharge of 1600 m3/sec. Estimate the surface width of the river according to Lacey’s regime theory.