A fixed time 2-phase signal is to be provided at a...
Guiding State PSC aspirants since 2016 50,000+ students · 1,000+ final selections Exam Calendar Results Call 9116926003
pscnotes
Pick your state
GPSC Prelims previous year questions

A fixed time 2-phase signal is to be provided at an intersection having four arms. The design hour traffic and saturation flow are as under: North (N) South (S) East (E) West (W) Design hour flow 800 400 750 600 Saturation flow 2400 2000 3000 3000 The time lost per phase due to starting delays is 2 seconds. Estimate the optimum signal cycle length.

Asked in GPSC Gujarat Engineering Service (Civil), Class-1 and Class-2 2025

  1. 40 sec
  2. 45 sec
  3. 50 sec
  4. 55 sec

Answer under review: our editors are checking this question. Try the other GPSC Prelims previous year questions questions meanwhile.

More GPSC Prelims previous year questions questions

All 77,252 GPSC Prelims previous year questions questions →