In CPM, what does the "Critical Path" represent?
Asked in GPSC Gujarat Water Supply and Sewerage Board Engi. Service (Mechanical) 2025
Answer under review: our editors are checking this question. Try the other GPSC Prelims previous year questions questions meanwhile.
More GPSC Prelims previous year questions questions
- In the context of PERT and CPM, what does the "slack time" or "float" of an activity represent?
- If an activity has a crash time of 4 days and a normal time of 6 days and the crash cost is Rs 2 Lakh, then what is the crash cost per day?
- In PERT analysis, what is the standard deviation of the activity duration, given the Optimistic Time (OT), Pessimistic Time (PT), and most likely Time (TM)?
- What is the primary purpose of a Zener diode?
- Which of the following components is used for controlling the power factor in an AC circuit?
- What is the main function of a transformer in an AC circuit?
- What does the term “virtual ground” mean in an operational amplifier (op-amp) configuration?
- Bar ‘A’ has diameter d and length L. Bar ‘B’ has diameter 2d and length 2L. The ratio of extension of bar A to extension of bar B is