In the context of PERT and CPM, what does the "slack time" or "float" of an activity represent?
Asked in GPSC Gujarat Water Supply and Sewerage Board Engi. Service (Mechanical) 2025
Answer under review: our editors are checking this question. Try the other GPSC Prelims previous year questions questions meanwhile.
More GPSC Prelims previous year questions questions
- If an activity has a crash time of 4 days and a normal time of 6 days and the crash cost is Rs 2 Lakh, then what is the crash cost per day?
- In PERT analysis, what is the standard deviation of the activity duration, given the Optimistic Time (OT), Pessimistic Time (PT), and most likely Time (TM)?
- What is the primary purpose of a Zener diode?
- Which of the following components is used for controlling the power factor in an AC circuit?
- What is the main function of a transformer in an AC circuit?
- What does the term “virtual ground” mean in an operational amplifier (op-amp) configuration?
- Bar ‘A’ has diameter d and length L. Bar ‘B’ has diameter 2d and length 2L. The ratio of extension of bar A to extension of bar B is
- A bar of uniform cross-section A and length L is suspended from top. The extension of the bar due to self-weight only in terms of Young’s modulus E and unit weight γ is