Internal audits are used to verify whether (i) Products conform to the technical specifications (ii) Quality management systems are effectively implemented
Asked in GPSC Engineering Aptitude 2024
Show answer
Answer: C. Both (i) and (ii)
This previous-year question came without the commission's answer key; the answer was checked by AI. Always confirm with the official key.
More GPSC Prelims previous year questions questions
- In India, which of the following sectors have well-defined Occupational Safety and Health (OSH) regulations?
- What is the objective of ISO 9000 family of quality management?
- Six sigma gives a precision of
- Match the DMAIC phases with their corresponding steps/definitions in six sigma methodology: 1. Define a. Identify the root causes of defects using statistical analysis 2. Measure b. Establish the problem statement, goals and customer requirements 3. Analyze c. Implement solutions and optimize the process for better performance 4. Improve d. Monitor and sustain improvements using control plans and documents 5. Control e. Collect data and quantify the current performance of the process
- Match the List-I with List-II and select the correct answer using the codes given below the lists. List-I List-II 1. Fineness of cement a. Le-Chatelier apparatus 2. Setting time b. Vicat’s needle 3. Soundness c. Air permeability apparatus 4. Workability d. Slump cone
- Which of the following statement(s) is/are true? (i) The duration along the critical path defines the shortest possible time required to complete a project (ii) The critical path is the longest sequence of dependent tasks in a project, and its total duration determines the project's minimum completion time
- Which of the following statement(s) is/are true? (i) Slack denotes the flexibility range within which an event can occur. (ii) In the critical path, the slack must be zero
- Which of the following statement(s) is/are true for resource levelling? (i) The project completion time is not extended even though there is a constraint in the availability of resources (ii) Start of the non-critical activities is delayed