Ques #: 66 Consider the following two schedules: S1: r3(X); r1(X); r1(Z); r2(Z); r3(Y); W1(X); C1; W3(Y); C3; r2(Y); W2(Y); W2(Z); C2; S2: r1(Z); r2(Z); r3(Y); r1(X); r3(X); W1(X); W3(Y); r2(Y); W2(Y); W2(Z); C1; C2; C3; Which of the following is true regarding above schedules? 1) S1: Conflict serializable, recoverable and cascadeless S2: Conflict serializable, neither recoverable nor cascadeless 2) S1: Conflict serializable, recoverable and cascadeless S2: Not conflict serializable, recoverable but not cascadeless 3) S1: Conflict serializable but neither recoverable nor cascadeless S2: Not conflict serializable 4) S1: Not conflict serializable but is recoverable and cascadeless S2: Conflict serializable and cascadeless but not recoverable
Asked in RPSC 23Feb 2016Question Paper for VicePrincipal/Superintendent ITI Screening Test 2012(Computer Science)VICE PRINCIPAL/SUPDT. ITI - 2012
Show answer
Answer: A. S1: Conflict serializable, recoverable and cascadeless S2: Conflict serializable, neither recoverable nor cascadeless
More RPSC Prelims previous year questions questions
- Ques #: 67 "Spiral model is an incremental model". How long the spiral will continue? 1) Until the system (or software) retires 2) Up to β-testing 3) When rest analysis is completed 4) None of these
- Ques #: 68 What does CASE Tool mean:- 1) Tools used for analysis and design only 2) Any computer based tool for software planning , development and evolution 3) Any tool used for case study only 4) Tools for testing the software
- Ques #: 69 Which of the following is an advantage of waterfall model ? 1) The model assume stage rigidity 2) Enforced disciplined approach 3) The model makes no allowance for prototyping 4) Relegating maintenance is limited to minor changes
- Ques #: 70 Which of the following is not a COCOMO-I MODEL ? 1) The early prototyping model 2) The early design model 3) The early testing model 4) The post-architectural model
- Ques #: 71 Waterfall model is not suitable for:- 1) Complex project 2) Small project 3) Accommodating project 4) None of these
- Ques #: 72 The following are the two main approaches to designing black box test cases :- 1) Equivalence class partitioning and Coincident object analysis 2) Equivalence class partitioning and Boundary value analysis 3) Boundary value analysis and Partitioning analysis 4) None of these
- Ques #: 73 Consider the following statements with respect to coding phase: I. Verification: It is the process of determining whether the output of one phase of software development conforms to that of its previous phase II. Validation: It is the process of determining whether a fully developed system conforms to its requirements specification. Which of the following is correct ? 1) I 2) II 3) Both are correct 4) None of the statements are correct
- Ques #: 74 Actual programming of software code is done during the ______ step in the SDLC. 1) Maintenance and Evaluation 2) Design 3) Analysis 4) Development and Documentation