Ques # :83 Two and half axis control in NC machines means 1) Control of three axis simultaneously 2) Control of two axis and spindle speed simultaneously 3) Control of two axis simultaneously and one axis independently 4) Control of two axis simultaneously and one axis is stationary
Asked in RPSC 23Feb 2016Question Paper for VicePrincipal/Superintendent ITI Screening Test 2012(Mechanical Engineering)VICE PRINCIPAL/SUPDT. ITI - 2012
Show answer
Answer: C. Control of two axis simultaneously and one axis independently
More RPSC Prelims previous year questions questions
- Ques # :84 Critical temperature is the temperature above which 1) A gas will never liquefy 2) A gas will immediately liquefy 3) Water will evaporate 4) Water will never evaporate
- Ques # :85 Time study of an operator with a performance rating of 120% yields a time of 2 minutes. If the allowances of 10% of total available time are to be given, then what is the Standard time of the operation. 1) 2.00 minutes 2) 2.40 minutes 3) 2.64 minutes 4) 2.67 minutes
- Ques # :86 Which one among the following is a 'THERBLIG' : 1) Get 2) Step 3) Put 4) Position
- Ques # :87 Work sampling is used to find 1) Percentage occurrence of certain activity 2) Rating of job 3) Pre-determined motion time data 4) Quality control of incoming inventory
- Ques # :88 Negative slack occurs when 1) Events stick to their schedule 2) There is deficiency of resources 3) Dummy activities are large in number 4) Activities lie on the critical path
- Ques # :89 The depreciation in any particular year is charged as fixed percentage of the remaining value of asset. This approach is adopted in 1) Sinking fund 2) Diminishing balance 3) Annuity charge 4) Sum of year digits
- Ques # :90 In PERT the span of time between the optimistic and pessimistic time estimates of an activity is 1) 6σ 2) 3σ 3) 12σ 4) σ
- Ques # :92 The aim of value engineering is to