The average journey time of test vehicle travelling with the stream is 6.5 min. The average journey time during trips against the stream is 8.5 min. The number of vehicles encountered in the stream while the test vehicle was moving against the traffic stream is 206, number of vehicles that had overtaken the test vehicle is 74 and the number of vehicles overtaken by the test vehicle is 10. Find the flow of the stream.
Asked in GPSC Gujarat Engineering Service (Civil), Class-1 and Class-2 2025
Answer under review: our editors are checking this question. Try the other GPSC Prelims previous year questions questions meanwhile.
More GPSC Prelims previous year questions questions
- In a braking test, a vehicle travelling at a speed of 36 kmph was stopped by applying brakes fully and skid marks were 4.0 m in length. Determine the average skid resistance of the pavement surface. Assume g = 10 m/sec2.
- A vehicle moving at 54 kmph speed was stopped by applying a brake and the length of the skid marks was 25 m. If the average skid resistance of the pavement is known to be 0.50, then determine the brake efficiency of the test vehicle. Assume g = 10 m/sec2.
- A cement concrete pavement of thickness 25 cm has two lanes of 7.2 m with a longitudinal joint along the centre. The value of allowable working stress in tension is 1800 kg/cm2. Assume unit weight of concrete = 2400 kg/m3 and coefficient of friction = 1.5. Estimate the area of steel per meter of longitudinal joint.
- A fixed time 2-phase signal is to be provided at an intersection having four arms. The design hour traffic and saturation flow are as under: North (N) South (S) East (E) West (W) Design hour flow 800 400 750 600 Saturation flow 2400 2000 3000 3000 The time lost per phase due to starting delays is 2 seconds. Estimate the optimum signal cycle length.
- The rise in water level due to the obstruction caused by bridge construction is called as
- A bridge has a linear waterway of 150 m constructed across a stream whose natural linear waterway is 250 meters. The average flood depth is 2.5 meters and the average flood discharge is 1500 m3 per second. Estimate the velocity of approach.
- A bridge that is constructed across a river has 3 spans. The clear distance between the two piers of the bridge is 20 meters. The width of each pier of the bridge is 5 meters. Estimate the length of the bridge.
- For a straight stream flow condition for bridge site, the value of design discharge is 650 m3 per second and the value of normal scour depth is 3.5 m. The value of constant for straight reach is 1.27. Estimate the maximum scour depth.