The Charpy test measures
Asked in GPSC Gujarat Engineering Service (Civil) Engineering Aptitude 2026
Show answer
Answer: B. Impact resistance
This previous-year question came without the commission's answer key; the answer was checked by AI. Always confirm with the official key.
More GPSC Prelims previous year questions questions
- The Liquidity Index (LI) of soil is determined for estimating its
- Which material is commonly used as a neutron moderator in nuclear reactors?
- In a construction project, the Critical Path Method (CPM) is used for scheduling. Which of the following statement(s) is/are TRUE regarding the critical path? (i) The critical path is the longest path through the network diagram and determines the minimum project duration. (ii) A project can have at most one critical path, and it remains fixed throughout the project execution. (iii) Crashing a non-critical activity always reduces the project duration if it is done on the most expensive activity first.
- In a construction contract, which of the following is a characteristic of a Lump Sum contract?
- During a construction project, a delay occurs due to an exceptionally heavy monsoon that is twice the 50-year return period rainfall. The contract has a force majeure clause. Which of the following is the most appropriate management action?
- In the context of Lean Construction, the term ‘Last Planner System’ primarily aims to
- Which of the following statement(s) is/are correct with respect to the Nagpur Road Plan? (i) It classifies the roads of the country into 5 categories (ii) It assumes a star and grid pattern of road network (iii) It considers railway track length independent of the road system, focusing on connecting every town with a population of over 2,000 (and lower in hilly areas) with metalled roads
- Which of the following methods of road construction suggested that heavy foundation stones are not at all necessary to be placed at the bottom of the construction?