40 Statements related to the context of permanent lining of shafts are given below- (1) Permanent lining is not required where the shaft sides are very strong and competent. (2) The shaft lining, in general, is constructed from top to bottom. (3) Only brick is used as permanent lining. (4) Shotcrete is also a type of permanent lining.

Asked in HPSC to Final Answer Key of the Master Question Booklet of the Screening Test for the Posts of Mining Officer (Advt. No. 08/) & Assistant Mining Engineer (Advt No. 09/) 2023

  1. Only (1) and (3) are correct.
  2. (1), (2) and (4) are correct.
  3. Only (1) and (2) are correct.
  4. Only (1) is correct.
  5. Question not attempted
Show answer

Answer: B. (1), (2) and (4) are correct.