34 A mine has to drive in a vein deposit of strike length 2.8 km, width of 7 m with a road header. The average production capacity of the road header is 30 m3/hr with an average effective monthly cutting hour of 255. The planned largest plying machine requires an excavation height of 5 m. The time in months (rounded up to nearest whole number) required to complete the drive development work is :

Asked in HPSC to Final Answer Key of the Master Question Booklet of the Screening Test for the Posts of Mining Officer (Advt. No. 08/) & Assistant Mining Engineer (Advt No. 09/) 2023

  1. 10
  2. 13
  3. 18
  4. 25
  5. Question not attempted

Answer under review: our editors are checking this question. Try the other HPSC Prelims previous year questions questions meanwhile.